Building Regulations for Extensions and Loft Conversions
Back to Blog
Building Regulations6 November 20266 min read

Building Regulations for Extensions and Loft Conversions

Quick answer: Extensions and loft conversions need building regulations approval, which is separate from planning permission. You apply to your council's building control or a registered building control approver, either with full plans or a building notice. The work is inspected as it goes, and at the end you receive a completion certificate, which you will need when you sell your home.

Planning permission decides whether you can build something. Building regulations decide how it must be built so that it is safe, warm and structurally sound. The government's guidance is clear that they are different things and you might need both. This guide explains what building regulations cover on extensions and loft conversions, how to apply, and what happens at the end.

What building regulations cover

The Building Regulations 2010 cover the construction and extension of buildings. On an extension or conversion they set standards for structure and foundations, fire safety and escape, insulation and energy efficiency, ventilation, drainage, stairs, sound insulation and electrical safety.

For loft conversions, Planning Portal guidance lists the main checks as the strength of the new floor, the stability of the structure including the existing roof, safe escape from fire, safely designed stairs and sound insulation between the conversion and the rooms below. In practice, on a typical two storey house that usually means:

  • new fire-resisting doors, and sometimes partitions, to protect the stairway, because escaping through windows above first floor level is too dangerous
  • mains powered, interlinked smoke alarms in the stairway at each level
  • a proper stair to the new floor, since retractable ladders are not normally acceptable
  • a new floor structure strong enough for living space, as existing ceiling joists are not designed for it

How to apply

You can apply to your local council's building control, usually online through the Planning Portal, or use a private registered building control approver, who will notify the council by giving an initial notice. There are two main types of application.

Full plans or building notice, from the government guidance
Full plansBuilding notice
Suitable forAny project; the most thorough optionSmaller projects only
Before work startsPlans checked, with a decision within 5 weeks, or 2 months with your consentWork can start 2 days after the notice is submitted
Formal approvalYes, plans are approved before you buildNo formal approval of plans

For most extensions and loft conversions, full plans is the safer route, because problems are picked up on paper rather than on site. Council fees are based on their costs and depend on the type of work, the inspections needed and, for extensions, the floor area. Private approvers agree their fees with you directly.

Inspections and the completion certificate

Building control inspects the work on site as it progresses. With a full plans application, you will usually receive a completion certificate within 8 weeks of the work being finished, as long as it complies. Keep it safe: the government guidance points out that without the certificates of compliance you may have problems when you come to sell your home.

Competent person schemes

Some work can be self-certified by a tradesperson registered with a competent person scheme, such as electricians, window installers and heating engineers. They notify the council for you and give you a certificate within 8 weeks of completion, which also shows up in solicitors' searches when you sell. The work still has to meet the regulations.

What if work was done without approval?

The government guidance says the person doing the work could be prosecuted and fined if it does not comply, and the council could make you pay to put faulty work right. Councils can approve some work retrospectively through a regularisation application, but only for work carried out after 11 November 1985, and you may have to open up or alter the work first. It is far simpler to get approval before you build.

Planning permission and party walls are separate

Building regulations approval does not give planning permission, and neither of them covers the Party Wall etc. Act 1996. Our guides on double storey extension planning permission, garage conversion planning permission and party wall agreements explain those parts. If you are planning an extension or loft conversion in Solihull or the West Midlands, we can talk through the approvals your project needs as part of a free, no obligation quote.

About HK Builders

HK Builders Ltd is a building company based in Shirley, Solihull, and a member of the Federation of Master Builders with over 20 years' experience. We build extensions, loft and garage conversions, renovations and new homes across Solihull, Birmingham and the West Midlands. Get in touch for a free, no obligation quote.

Call 07393 194 336Get a free quote

Frequently asked questions

Do I need building regulations approval for an extension?

Yes. The Building Regulations 2010 cover the construction and extension of buildings, so an extension needs approval from your council's building control or a registered building control approver.

What is the difference between full plans and a building notice?

With full plans, your drawings are checked and approved before work starts, with a decision within 5 weeks, or 2 months with your consent. A building notice is only for smaller projects: work can start 2 days after it is submitted, but there is no formal approval of plans.

What happens if building work does not have building regulations approval?

The person doing the work can be prosecuted and fined, the council can require faulty work to be put right, and you may not have the certificates you need when you sell. Councils can sometimes approve work retrospectively through regularisation.

When do I get a completion certificate?

With a full plans application you will usually get a completion certificate within 8 weeks of the work being completed, as long as it complies with the regulations.